Register here:
https://events.uic.org/final-conference-of-the-shift2rail-ju-funded-ip3-project-in2track
This project is working to develop new methods and techniques to optimise the track systems, improve the operational performance of existing switches and crossings and extend the life of bridges and tunnels, researching new methods for maintaining and upgrading these structures.
This project focuses on developing new, more accurate methods for inspection and assessment of structures. In2Track is developing new techniques for repair and upgrade to reduce traffic disruption, and the project is working on methods to reduce noise and vibration. The project focuses on developing safer methods of assessment for tunnels and bridges that include the use of embedded sensors for self-diagnostics and condition monitoring.
The project will be over in a few months and we will be very pleased to have the opportunity to present the results of this exciting project.
Event Programme
09:00-09:30 Registration and welcome
09:30-10:20 Welcome and introduction - Mr Sam Berggren, Trafikverket
10:20-11:20 WP2 - Enhanced switches and crossings, Mr Ian Coleman, Network Rail
11:20-11:40 Coffee break
11:40-12:40 WP3 - Enhanced track, Mr Anders Ekberg, Trafikverket
12:40-13:50 Networking Lunch
13:50-14:50 WP4 - Structures, Mr Carlos Hermosilla, Acciona
14:50-16:00 Round table, wrap-up and conclusions
More information on the conference and registration form is available on the UIC website at https://events.uic.org/final-conference-of-the-shift2rail-ju-funded-ip3-project-in2track
The event is free of charge. Travel and accommodation expenses are the responsibility of the participant.