Project information
- Long trains with distributed power
- Project director: Christian Chavanel
- Project manager: Giulia Russo
- Status: completed project
- Project code: 2018/RSF/573
Project description
Problem to solve:
- Implementation of freight cross-border traffic exploiting new technologies such as remote control
- Increase and optimisation of tonnage/length of freight trains
Added values: - Additional development of the TrainDy software
- Follow-up, practical implementation and adaptation of the statistical methodology of the UIC421 project for remote controlled trains
- Validation of TrainDy results with tests carried out in the Shift2Rail project